High quality factory Automatic transfer switching equipment-FTQ3 to United Arab emirates Factories

Overview:



Technical data

Product illustration

Tripping characteristic

Exterior and dimensions

Related video

Gaining customer satisfaction is our company's aim forever. We will make great efforts to develop new and top-quality products, meet your special requirements and provide you with pre-sale, on-sale and after-sale services for High quality factory Automatic transfer switching equipment-FTQ3 to United Arab emirates Factories, We have confident that we can provide the high quality products at resonable price, good after-sales service to the customers. And we will create a bright future.


Model: FTQ3-63 FTQ3-125 FTQ3-250 FTQ3-400 FTQ3-800
Rated current (A)Ie: 16,20,25,32,40,50,63 63,80,100,125 125,160,200,225,250 250,300,315,350,400 400,500,630,800
Pole: 3,4
Main function: Mainly used for power circuit monitoring.When the normal power supply is in the event of failure,it will transfer the power supply

from normal power to backup power supply and finish the switching the circuit system.

Standard: GB/T14048.11-2016(ICE 60947-6-1:2013)
Rated voltage (V): AC 400V
Rated frequency: 50/60
Rated insulation voltage: 800
Rated impulse withstand voltage Uimp(KV): 8
Connection and breaking capacity: 10Ie 6Ie
Status indication: Normal power/backup power on-off,Fault display,Fire linkage display,Normal power/backup power voltage.
Under-voltage: 150-180
Over-voltage: 250-280
Controller voltage: AC220
Connection mode: Front connection plate
Minimum transfer time 50 50 75 75 1200
Operation cycle time(time/hour) 120
Class PC
Usage category AC-33A AC-33B AC-33iB




  • Disclaimer: This video is to show the way I did the job of upgrading my 10/3 feeder wire. I am not showing the way all the experts watching would do it. I am a licensed aircraft avionics (electrician) not a home electrician:I did not cut a long opening in the drywall. This sub-panel was inspected by an electrical underwriter back in 1985. Now I am wiring my new workshop with an existing sub-panel I had installed back in 1985. I am a licensed aircraft technician and was allowed by the town code board to wire my own one family house wiring, including connecting to the incoming power company wiring that terminated on a pole connected to my house, this was back in 1985, I do not think that is allowed anymore.Now I am updating the size to 10/3 coming from the sub-panel to the underground UV cable I had buried back in 1985. The two 30 amp switches I have been using, although renewed, could be eliminated and just use the sub panel circuit breakers when your not using shed power, also I am installing an 8 foot copper rod, pounded into the ground and connected to the shed box neutral bar using unshielded solid # 4 copper wire with the required rod clamp. The main house neutral bar is also connected to a #4 solid copper ground wire unbroken to the pipe below the house’s main water shut off valve and continues out of the house and connected to an 8 foot copper rod with heavy required clamp.This gets pounded below the dirt close to the foundation. Over 616 HD Video

    Related Products

    WhatsApp Online Chat !