Massive Selection for Miniature circuit breaker-FTB10 to Norwegian Factory

Overview:



Technical data

Product illustration

Tripping characteristic

Exterior and dimensions

Related video

We offer great strength in quality and development,merchandising,sales and marketing and operation for Massive Selection for Miniature circuit breaker-FTB10 to Norwegian Factory, Welcome to visit us at any time for business relationship established.


Model: FTB10
Pole: 1P+N
Rated current (A): 6,10,16,20,25,32,40
Rated frequency: 50
Rated voltage (V): 230
Rated impulse withstand voltage Uimp(KV): 4
Breaking Capacity: 6
Operating cycle times /hour 240
Power on 4500
Power off 10000
Conventional non-tripping current: 1.13In t≤1h
Conventionaltripping current: 1.45In t<1h
2.55In 1s<t<60
Instantaneous tripping type: C
Instantaneous non-tripping current: t≤0.1s 5In
Instantaneous tripping current: t<0.1s 10In
Connection Wire ㎜²: Min/Max 1/10
Size(L×W×G)mm 1P+N 74.2×18×80




In this video I show you how to troubleshoot your Frigidaire Dryer that has an error code E68.

This code refers to a Stuck Button on your dryer. To find out which button is stuck you would want to run the function test mode of your dryer and run the key test.

The diagnostic test will show you what button is not functioning properly. You should remove the control panel and inspect each button for proper function.

Reassemble the dryer and re run the test again. If the button works now great. If not you will have to replace the dryer’s main control to fix the problem.

Here is a video showing you how to disassemble this dryer and replace the belt

Here is the link to the contest giveaway

http://www.applianceoutletservice.com/contest/contest.htm

Make sure you subscribe to my YouTube Channel so you don’t miss any new repair videos. Don’t forget to Like and Favorite the videos.



Harris provided construction management services for an electrical substation project in the Silicon Valley. In this video, Harris Project Manager Rocco Colicchia gives a tour of the substation and discusses the services Harris provided. The project reached completion in March and the municipal utility’s crews successfully connected the new substation to the 60kV line.

Related Products

WhatsApp Online Chat !