Ordinary Discount Automatic Transfer Switching Equipment-FTQ2 to Cyprus Manufacturers

Overview:



Technical data

Product illustration

Tripping characteristic

Exterior and dimensions

Related video

We always believe that one's character decides products' quality, the details decides products' quality ,with the REALISTIC,EFFICIENT AND INNOVATIVE team spirit for Ordinary Discount Automatic Transfer Switching Equipment-FTQ2 to Cyprus Manufacturers, Please send us your specifications and requirements, or feel free to contact us with any questions or inquiries that you may have.


Model: FTQ2
Poles: 3,4
Rated operational voltage Ue(V): AC400V/50HZ
Rated operational current Ie(A): 20,25,32,40,50,63,80,100,125,160,180,200,225,315,350,400,500,630
Rated insulation voltage Ui(V): 690V
Operating position: Normal power switch-on, backup power switch-on, Normal power& backup power switch-off
Electrical level: CB
Rated controller Operating supply voltage: AC220V
Under-voltage: Adjustable from 160-200v,factory defaults:170V
Over-voltage: Adjustable from 240-290V,factory defaults:270V
Operation Mode: R:automatic change recovery,S:automatic change but not automatic recovery,F:Generator type
Switch-off delay time: Adjustable from 0-180s,factory defaults:2s
Switch-on delay time: Adjustable from 0-180s,factory defaults:2s




Shoreline Marine presents “Captain Weekend”, Loye Futch, a 25 year veteran of the marine industry and professional boat mechanic, who will show you how to install an electrical switch panel.



MPMC Powertech Corp equip the test room with system meets the international standard, high-performance integrated test system. The test system use Lab VIEW, powerful analytical tools, combined with the American NI company ‘S NI high-speed data acquisition card to achieve the real-time measurement, analysis and monitoring on various parameters and performance of the generator set. In constant temperature of 40 degrees Celsius and ultra-quiet testing room, to meet the maximum 2500KW generator set testing needs. With different loads, can be done at any percentage of sudden load, sudden offload, and are able to display and save information of changes in form or graph, recovery time and curve in the loading.
MPMC’s test system has the following characteristics:
(1) The superior handling, quickly generate test reports, automatically determines the test results.
(2) Flexible scalability facilitates future station position, power expansion, and can achieve multiple machines in parallel.
(3)powerful function, real-time monitoring function offer the real-time operational data of generator set; the huge amount of data storage can support more than one million models of generator sets data saving. Besides, break the restrictions of traditional instruments, solve the problems of harmonic test and vibration test, optimize the test system and provide a more professional platform for the detection of generator sets.
(4) High efficiency, a single test system can test completed more than one hundred units per day, reached the international advanced level.
(5) Meet a variety of stringent standards, such as GJB235A-97 standard “military exchange mobile station General technical conditions” GJB 1488-92: “Common test methods for military internal combustion engine power plant”.
Every generator set of MPMC must through this test. The test steps are as follows:
(1) Generator set is placed into the appropriate location of the test room, to allow sufficient space for air intake and exhaust.
(2)The external inlet connected to the engine fuel return pipe. Add oil to the engine pan, add coolant to the water tank.
(3)The load lines are connected to the output of the circuit breaker.
(4)Outside the test room, start the intake and exhaust fan and then start the generator set.
(5)In the control room operate the monitoring platform, reduce and increase loading, test each performance parameter, and automatically produce and analysis test report.
(6)If the product is qualified, gradually unload the entire load, let the generator run at idle load for 3 to 5minutes.After that, stop and drain the lubricant and coolant.
(7) The generators transported to the specified location, waiting for clearance and packing.
Mpmc Diesel Generator:http://www.mpmc-china.com

Related Products

WhatsApp Online Chat !